Prestige Food Chopper 2L Black/Clear/Silver

Prestige Food Chopper 2L Black/Clear/Silver

Prestige Blender 1.5 Litres

Prestige Blender 1.5 Litres

Prestige Hand Blender 700W Silver

OMR 27.600

Price inclusive of VAT

  • Product Type : Hand Blender
  • Material: Stainless Steel
  • Power: 700W
  • Brand: Prestige
  • Color: Silver
Availability: In stock
SKU
BWNVSPR54946

Delivery timeline

Power supply 220-240 V
Color Name Silver
Energy Used Electric
Installation Handheld
Material Stainless Steel
Model Number PR54946
Product Height 30.6 cm
Product Length 34.9 cm
Product Width/Depth 19.9 cm
Wattage 700 W